Illuminated Modern S-Curved Alabaster Wall Sconce Studio Shot

Alabaster Serpentine Wall Sconce – Integrated LED, Brass Details for Bedroom Lighting Custom

W 2.4″ x H 23.7″ / Brass & White / Warm Light
$425.00
Sale price  $425.00 Regular price  $560.00
Skip to product information
Illuminated Modern S-Curved Alabaster Wall Sconce Studio Shot

Alabaster Serpentine Wall Sconce – Integrated LED, Brass Details for Bedroom Lighting Custom

LW69470-1
$425.00
Sale price  $425.00 Regular price  $560.00
Shipping calculated at checkout.

Shipping rates and eligibility vary by product and destination. View the Shipping Policy for details.

Shipping by Destination
Free on qualifying orders
Easy Returns
30-day return policy
Secure Payment
SSL encrypted checkout

Black Friday Exclusive! Enjoy 20% OFF your order with code BF2026 at checkout. Ends November 30, 2026.

SizeW 2.4″ x H 23.7″
ColorBrass & White
Kelvin rangeWarm Light
  • American Express
  • Apple Pay
  • Bancontact
  • Google Pay
  • Mastercard
  • MB WAY
  • PayPal
  • Shop Pay
  • Union Pay
  • Visa
Free Standard Shipping
30-Day Returns & Exchanges
Custom Sizes on Request
Free Design Consultation
LIVE ORDER ACTIVITY
✅ Emma W. in New York ordered Fairbanks Floor Lamp #8201
⭐⭐⭐⭐⭐ "Stunning light! Fast shipping." - Sarah J.
🔥 James T. in London ordered Lorenzo Murano Chandelier #8202
✨ Isabella P. in Miami ordered Nordic Wooden Fan #8207
✅ Emma W. in New York ordered Fairbanks Floor Lamp #8201
⭐⭐⭐⭐⭐ "Stunning light! Fast shipping." - Sarah J.
🔥 James T. in London ordered Lorenzo Murano Chandelier #8202
✨ Isabella P. in Miami ordered Nordic Wooden Fan #8207
In stock

The Serpentine Alabaster Wall Sconce features a single ribbon of natural white alabaster that curves in a long S-shaped profile along the wall. A round brass disc anchors the sculptural stone at the centre, while the integrated LED produces a warm 3000K glow through the alabaster’s soft natural veining. Designed as a statement wall light, its flowing form works beautifully in living rooms, bedrooms, hallways, staircases, and other modern interiors.

Choose from 1 listed size or configuration option. Available finish combinations: Brass & White.

Serpentine Alabaster Wall Sconce for Bedroom Details

  • Materials: Brass
  • Body material: Brass
  • Shade material: Alabaster
  • Light source: Integrated LED
  • Color temperature: Warm light (3000K)
  • Connection: Hardwired
  • Mounting: Wall, hardwired
  • Control: Compatible with common push switches (switch not included)
  • IP rating: IP20 – damp-rated, not waterproof; indoor use only
  • Environment: Indoor use

Size

W 2.4″ × H 23.7″

Serpentine Alabaster Wall Sconce for Bedroom product and dimension reference

Color

Brass & White

Customization Options

Choose a standard configuration from the options above. For any other dimensions or finish requirements, contact our team before ordering so availability and technical feasibility can be reviewed.

Standard Version

  • Select the listed size or configuration and finish.
  • Review the light source and electrical details for your selected version.
  • Purchase directly at the displayed price, subject to availability.

Made-to-Order Customization

Send your preferred dimensions, finish and installation requirements. Our team will confirm feasible options, a separate quotation and production time before a custom order is placed.

How to Order

For a standard order, select the configuration and finish, then add the product to your cart. Choose the regional plug where offered. For a custom request, contact our team before checkout and wait for the specification and quotation to be confirmed.

FAQ

What is it made of?

Brass. Review the selected finish and the product photographs before ordering.

Which size should I choose?

Available configurations: W 2.4″ × H 23.7″. Measure the installation area and compare the selected configuration with your furniture and room clearance. Current options above define the standard version you are ordering.

What light source does it use?

Light source: Integrated LED. This version uses an integrated light source rather than a standard replaceable bulb. Contact our team for service information before opening electrical components.

How is it controlled, and can I dim it?

Compatible with common push switches (switch not included). Confirm compatibility before adding a dimmer; a standard on/off switch is not a dimmer.

What should I check before installation?

Hardwired Wall, hardwired. Have a qualified electrician confirm the electrical connection, mounting support and local installation requirements.

Where can I use it?

Listed location information: Indoor use; IP20 – damp-rated, not waterproof; indoor use only. Choose a dry indoor location unless this exact configuration is explicitly rated otherwise. Confirm suitability before installation near steam, splashes or outdoor exposure.

How do I clean it?

Disconnect power and let the light cool. Dust gently with a soft dry cloth; avoid abrasive cleaners and soaking. Support shades and moving parts while handling them.

How do I request a custom version?

Contact our team with your requested dimensions, finish and installation requirements before ordering. Availability, technical feasibility, pricing and production time must be confirmed separately.

You may also like

Lighting Collections

View all

Liora — The Hit List

Our most-loved collections, where refined elegance meets expert craftsmanship to illuminate your home with character.

Subscribe to our emails

Be the first to know about new collections and special offers.